Earthing and static bonding of piping
Flowing liquids and gases build up static charge. If the metal they flow through is not connected to earth, the charge can jump as a spark, which matters wherever there is a flammable atmosphere.
Earthing and bonding
- Bonding connects metal parts to each other, so they stay at the same voltage.
- Earthing (grounding) connects them to the earth grid, so charge drains away.
Steel piping is normally earthed through the equipment and structures it connects to. The electrical engineer sets the earthing points; piping provides the lugs or bosses where needed.
Do flanges need jumpers?
Usually not. A normal bolted flange with metal bolts and a metallic or semi-metallic gasket conducts well enough. Static codes treat a path to earth of up to about 1 MΩ as enough to drain static, and bolted flanges are far below that. Many projects still set a lower test value; follow the project specification.
When jumpers are needed
- Bolts that are coated with PTFE or another insulating coating.
- Non-metallic gaskets together with coated or painted contact faces.
- Swivel joints, loading arms and rotating joints.
- Flexible hoses and expansion joints with non-conductive parts.
- Non-metallic piping (plastic, FRP) carrying low-conductivity flammable liquids: these need special measures, set by the electrical engineer.
What not to bond
Never put a jumper across an insulating joint. Those joints are there to block cathodic protection current, and a jumper defeats them. Where they need protection from lightning or faults, a spark gap or surge arrester is fitted instead.
Practical points
- Jumpers must be flexible enough for the pipe to move and must not be painted over at the contact.
- Check that supports with insulating pads (for cold or cathodically protected lines) have not cut the pipe off from earth.
- Tank, truck and drum filling connections need bonding before transfer starts.
Common questions
Do I need jumper cables on every flange?
Usually not. Metal bolts and metallic or semi-metallic gaskets conduct enough. Jumpers are for coated bolts, non-metallic joints, hoses and swivels.
What is the difference between earthing and bonding?
Bonding connects metal parts to each other. Earthing connects them to the ground grid.
Can I bond across an insulating flange?
No. It would short out the cathodic protection. Use a spark gap or surge arrester if protection is required.