How to calculate hydrotest pressure (ASME B31.3)
A hydrotest proves the piping is strong and tight before it goes into service. B31.3 sets the minimum test pressure with one short formula, but a few checks decide whether you can actually use it.
Step 1: the basic test pressure
For a hydrostatic test, ASME B31.3 para. 345.4.2 sets the minimum test pressure at every point as:
P_T = 1.5 × P × S_T / S
P is the design pressure, ST the allowable stress at test temperature and S the allowable stress at design temperature. The ratio makes up for the metal being stronger cold than hot. It may not be taken above 6.5.
Step 2: check yield
If that pressure would stress the pipe above its yield strength at test temperature, the test pressure may be reduced to the highest that does not. Check the hoop stress with PT·D / 2t on the minimum wall.
Step 3: add the static head
PT is the minimum at the highest point. Lower down, the water adds about 0.098 bar per metre. On a tall system, the bottom can be well above the top, so check yield and flange limits there.
Step 4: check flanges and components
ASME B16.5 flanged joints may take a system test of up to 1.5 times their 38 °C rating, rounded up to the next 1 bar. Control valves, relief valves, instruments, expansion joints and equipment may have lower limits: isolate or remove them.
Worked example
NPS 6 Sch 40, A106 Gr B, design 40 bar(g) at 200 °C, with ST = S = 138 MPa, yield 241 MPa, Class 300 flanges and a high point 10 m above the low point.
- PT = 1.5 × 40 × 138/138 = 60.0 bar(g) at the high point.
- Low point: 60.0 + 0.0981 × 10 = 61.0 bar(g).
- Hoop stress on the minimum wall (7.11 × 0.875 = 6.22 mm): 6.10 × 168.3 / (2 × 6.22) = 82.5 MPa, well below 241 MPa.
- Class 300 flange limit: 1.5 × 51.1 = 76.65, rounded up to 77 bar, above 61.0 bar: OK.
Pneumatic and B31.1
A B31.3 pneumatic test uses 1.1 × P, with extra precautions because compressed gas stores much more energy than water. ASME B31.1 power piping uses 1.5 × P for a hydrostatic test.
Common questions
Why is the test pressure 1.5 times design?
It gives a margin that shows the system is sound well above its working pressure, without taking the metal past yield.
Where is the hydrotest pressure measured?
B31.3 sets the minimum at every point, so the gauge reading at the highest point must reach P_T. Lower points will be higher by the static head.
How long is a hydrotest held?
B31.3 asks for at least 10 minutes, then long enough to inspect every joint. Project procedures often set longer holds.