89 piping design questions on valves, flanges, pipe, fittings, supports, testing, instruments and CAD, each with the answer, a short explanation and the guide and tool behind it. A new one appears on the homepage every day.

Basics

#76Which code covers process piping in refineries and chemical plants?
  1. ASME B31.1
  2. ASME B31.8
  3. ASME B31.3
  4. ASME B31.4

Answer: ASME B31.3. B31.3 is process piping. B31.1 is power piping, B31.4 liquid pipelines and B31.8 gas transmission.

Open the tool

#79Why are molten sulphur lines steam-jacketed?
  1. To lower pressure drop
  2. To stop corrosion
  3. For fire protection
  4. Sulphur solidifies if it cools below about 115 °C

Answer: Sulphur solidifies if it cools below about 115 °C. Sulphur melts at about 115 °C, so the jacket keeps it hot enough to flow without freezing in the line.

Open the tool

#80What does a Claus sulphur recovery unit recover?
  1. Hydrogen from water
  2. Diesel from crude
  3. Elemental sulphur from H₂S
  4. Steam from flue gas

Answer: Elemental sulphur from H₂S. The Claus process turns hydrogen sulphide from the refinery’s gas streams into elemental sulphur.

Open the tool

#82Which refinery unit removes sulphur compounds from products?
  1. Fluid catalytic cracker
  2. Hydrotreater
  3. Crude distillation unit
  4. Coker

Answer: Hydrotreater. Hydrotreaters react the sulphur compounds with hydrogen to make H₂S, which then goes to the sulphur recovery unit.

Open the tool

#85What does a steam trap do?
  1. Measures steam flow
  2. Raises steam pressure
  3. Stops reverse flow
  4. Lets condensate out while keeping steam in

Answer: Lets condensate out while keeping steam in. Traps drain condensate from steam lines and equipment without letting live steam escape.

Open the tool

CAD

#18Which AutoCAD command counts each block in a drawing?
  1. LIST
  2. BCOUNT
  3. DIST
  4. AREA

Answer: BCOUNT. BCOUNT, then Enter, reports every block and its count. BricsCAD has it too.

Open the tool

#40Which command deletes duplicate and overlapping lines?
  1. EXPLODE
  2. AUDIT
  3. PURGE
  4. OVERKILL

Answer: OVERKILL. OVERKILL removes doubled and overlapping objects. PURGE removes unused layers and blocks.

Open the tool

#52What is the default AutoCAD alias for OFFSET?
  1. O
  2. OFF
  3. OS
  4. OF

Answer: O. O runs OFFSET. BricsCAD uses the same alias.

Open the tool

#63Which command turns a vector PDF into editable CAD lines?
  1. EXPORTPDF
  2. PDFIMPORT
  3. PUBLISH
  4. PDFATTACH

Answer: PDFIMPORT. PDFIMPORT converts the PDF; PDFATTACH only shows it as an underlay you can snap to.

Open the tool

#73How do you edit many block attribute values in Excel?
  1. XREF, then BIND
  2. ATTOUT, edit, then ATTIN
  3. PURGE, then AUDIT
  4. BURST, then JOIN

Answer: ATTOUT, edit, then ATTIN. ATTOUT writes the attributes to a text file; after editing in Excel, ATTIN reads them back in.

Open the tool

Drawings

#83How are piping isometrics usually drawn?
  1. As a 3D photo
  2. On 30° axes and not to scale
  3. As an elevation only
  4. Exactly to scale in plan

Answer: On 30° axes and not to scale. Isometrics show the route on three axes; the dimensions, not the drawing scale, carry the lengths.

Open the tool

#89On a P&ID, what is the line number used for?
  1. Identifying the line and its size, service and spec
  2. The weld count
  3. The pipe length
  4. The drawing revision

Answer: Identifying the line and its size, service and spec. The line number ties the line to its size, fluid, piping class and insulation in the line list.

Open the tool

Electrical

#17Should you put a bonding jumper across an insulating flange?
  1. Yes, always
  2. No, it would short out the cathodic protection
  3. Only above NPS 12
  4. Only on gas lines

Answer: No, it would short out the cathodic protection. The insulating joint is there to block cathodic protection current. A jumper defeats it; use a spark gap or surge arrester if protection is needed.

Read the guideOpen the tool

#37Do normal bolted flanges need static bonding jumpers?
  1. Usually not: metal bolts conduct enough
  2. Yes, every flange
  3. Only on water lines
  4. Only when painted

Answer: Usually not: metal bolts conduct enough. Metal bolts and metallic gaskets conduct well enough. Jumpers are for coated bolts, non-metallic joints, hoses and swivels.

Read the guideOpen the tool

#50What are insulating flange kits mainly used for?
  1. Insulating hot lines
  2. Reducing noise
  3. Isolating a cathodically protected buried line from plant piping
  4. Sealing RTJ flanges

Answer: Isolating a cathodically protected buried line from plant piping. They stop the protection current on a buried pipeline from draining into the earthed plant piping.

Read the guideOpen the tool

#66Which joint usually DOES need a bonding jumper?
  1. A butt weld
  2. A steel threaded coupling
  3. A standard bolted steel flange
  4. A swivel joint or flexible hose

Answer: A swivel joint or flexible hose. Swivels, hoses and non-metallic parts can break the electrical path, so they are bonded across.

Read the guideOpen the tool

Fittings

#7What is the centre-to-end of a long-radius 90° elbow?
  1. 1.5 × NPS
  2. 3 × NPS
  3. 1 × NPS
  4. 2 × NPS

Answer: 1.5 × NPS. A long-radius elbow has a centre-to-end of 1.5 times the nominal size in inches, for NPS ¾ and above. Short radius is 1 × NPS.

Read the guideOpen the tool

#22Why are long-radius elbows preferred over short-radius ones?
  1. Socket weld needs them
  2. Lower pressure drop and smoother flow
  3. They are shorter
  4. They are always cheaper

Answer: Lower pressure drop and smoother flow. The gentler bend loses less pressure and erodes less. Short radius is kept for tight spots.

Read the guideOpen the tool

#29Which standard covers butt-weld fittings like elbows and tees?
  1. ASME B16.9
  2. ASME B16.5
  3. ASME B16.11
  4. ASME B16.34

Answer: ASME B16.9. B16.9 covers factory-made wrought butt-welding fittings. B16.11 is socket-weld and threaded, B16.5 is flanges.

Open the tool

#36Socket-weld fittings are usually limited to which sizes on most projects?
  1. NPS 12 and smaller
  2. NPS 6 and smaller
  3. NPS 2 and smaller
  4. Any size

Answer: NPS 2 and smaller. Most piping specifications use socket weld for small bore, typically NPS 2 and below, and butt weld above.

Open the tool

#47How is an eccentric reducer usually fitted on a pump suction?
  1. Flat side up
  2. Flat side down
  3. Either way
  4. Only on vertical lines

Answer: Flat side up. Flat side up, so no air pocket can form at the top that would make the pump cavitate.

Open the tool

#58When welding a socket-weld joint, what gap is left at the bottom of the socket?
  1. About 1.6 mm (1/16 in)
  2. About 6 mm
  3. About 10 mm
  4. No gap

Answer: About 1.6 mm (1/16 in). Pull the pipe back about 1.6 mm before welding so the weld does not crack when the joint heats and grows.

Open the tool

#65Which standard covers socket-weld and threaded fittings?
  1. ASME B36.10
  2. ASME B16.11
  3. ASME B16.5
  4. ASME B16.9

Answer: ASME B16.11. B16.11 covers forged socket-weld and threaded fittings.

Open the tool

#74When is branch reinforcement needed?
  1. On every tee
  2. When the hole for the branch removes more metal than the run can spare
  3. Never under B31.3
  4. Only on plastic pipe

Answer: When the hole for the branch removes more metal than the run can spare. B31.3 checks the area removed by the opening against the spare thickness available; if short, add a pad or use a stronger fitting.

Open the tool

#87A short-radius elbow has a centre-to-end of…
  1. 1 × NPS
  2. 2 × NPS
  3. 1.5 × NPS
  4. 0.5 × NPS

Answer: 1 × NPS. Short radius is 1 × NPS; long radius is 1.5 × NPS. Short radius is used where space is tight.

Read the guideOpen the tool

Flanges

#3Does Sch 80 pipe need a bigger flange than Sch 40 of the same NPS?
  1. No, the OD is the same so the flange fits
  2. Only in Class 300 and above
  3. Yes, one size up
  4. Only for slip-on flanges

Answer: No, the OD is the same so the flange fits. The outside diameter does not change with schedule, so the same flange fits. Only the bore of a weld neck must match the wall.

Read the guideOpen the tool

#8Which flange is preferred for high-stress or cyclic service?
  1. Weld neck
  2. Threaded
  3. Lap joint
  4. Slip-on

Answer: Weld neck. The weld neck has a tapered hub and one full butt weld, so it handles bending and fatigue far better than a slip-on.

Read the guideOpen the tool

#13How does an RTJ flange seal?
  1. With a metal ring in a machined groove
  2. With an O-ring
  3. With a spiral wound gasket
  4. With a full-face rubber gasket

Answer: With a metal ring in a machined groove. Ring-type joint flanges seal with a solid metal ring (oval or octagonal) pressed into grooves in both faces.

Read the guideOpen the tool

#19What is the outside diameter of an NPS 2 Class 150 flange?
  1. 114.3 mm
  2. 152.4 mm
  3. 165.1 mm
  4. 127.0 mm

Answer: 152.4 mm. An NPS 2 Class 150 flange is 152.4 mm (6 in) across, with four ⅝ in bolts.

Read the guideOpen the tool

#26How many bolts does an NPS 4 Class 150 flange have?
  1. 6
  2. 12
  3. 4
  4. 8

Answer: 8. Eight bolts of ⅝ in on a 190.5 mm bolt circle.

Open the tool

#33Which bolt size does an NPS 6 Class 150 flange use?
  1. ⅝ in
  2. ¾ in
  3. ⅞ in
  4. 1 in

Answer: ¾ in. Eight ¾ in bolts on a 241.3 mm bolt circle.

Open the tool

#43Which standard covers flanges above NPS 24?
  1. ASME B16.9
  2. ASME B16.11
  3. ASME B16.5
  4. ASME B16.47

Answer: ASME B16.47. B16.5 stops at NPS 24. Larger flanges, NPS 26 to 60, are in B16.47 Series A or B.

Open the tool

#53As design temperature rises, a flange’s allowable pressure…
  1. Doubles above 200 °C
  2. Goes up
  3. Stays the same
  4. Goes down

Answer: Goes down. Steel weakens with temperature, so the B16.5 pressure–temperature ratings fall as temperature rises.

Open the tool

#60What is a spectacle blind used for?
  1. Measuring flow
  2. Supporting the pipe
  3. Reducing the line size
  4. Positively isolating a line

Answer: Positively isolating a line. Turned to the blind side it gives positive isolation; turned to the open side the line runs normally.

Read the guideOpen the tool

#70Which gasket is most common on raised-face flanges in process service?
  1. Oval ring
  2. Spiral wound
  3. Lens ring
  4. Full-face rubber

Answer: Spiral wound. Spiral wound gaskets with inner and outer rings are the usual choice for raised-face process flanges.

Read the guideOpen the tool

#77B16.47 Series A flanges, compared with Series B, are…
  1. Lighter, with more and smaller bolts
  2. Only for Class 150
  3. Heavier, with fewer and larger bolts
  4. Identical

Answer: Heavier, with fewer and larger bolts. Series A (from MSS SP-44) is the heavier pattern with fewer, larger bolts. Series B (from API 605) is lighter with more, smaller bolts.

Open the tool

#86In a spectacle blind, when is the open (spacer) side in the line?
  1. When the line is isolated
  2. When the line is in service
  3. Never
  4. Only during hydrotest

Answer: When the line is in service. Open side in for normal operation, blind side in for positive isolation.

Read the guideOpen the tool

Instruments

#6Where should a pressure tap go on a horizontal gas line?
  1. On the bottom
  2. On the side, below centre
  3. On the top
  4. Anywhere

Answer: On the top. From the top, so any liquid that condenses drains back into the pipe instead of sitting in the impulse line.

Read the guideOpen the tool

#9What does FIC stand for on a P&ID?
  1. Field instrument cable
  2. Flow integrating counter
  3. Flow indicating controller
  4. Fire isolation control

Answer: Flow indicating controller. F is flow, I is indicating, C is controller. The number after it is the loop.

Read the guideOpen the tool

#16Where should a pressure tap go on a horizontal liquid line?
  1. Anywhere
  2. On the very bottom
  3. On the side, from horizontal to about 45° below
  4. On the top

Answer: On the side, from horizontal to about 45° below. From the side, so gas cannot collect in the tap and dirt from the bottom does not block it.

Read the guideOpen the tool

#25What is a TW on a P&ID?
  1. Tube wall
  2. Test weld
  3. Thermowell
  4. Temperature wire

Answer: Thermowell. TW is the thermowell, the pocket in the pipe. The temperature element (TE) sits inside it.

Read the guideOpen the tool

#30What does LAHH mean?
  1. Level actuator high head
  2. Level alarm high-high
  3. Level analyser hot hold
  4. Line at high height

Answer: Level alarm high-high. L is level, A is alarm, HH is high-high: the second, more urgent high alarm.

Open the tool

#35For gas service, where should the transmitter sit relative to the tap?
  1. Below the tap
  2. It does not matter
  3. Level with it
  4. Above the tap

Answer: Above the tap. Above, so condensed liquid drains back to the pipe instead of filling the impulse line.

Read the guideOpen the tool

#42A small line is too short for a thermowell. What is a common fix?
  1. Put it on the outside of the pipe
  2. Cut the well short
  3. Fit the well in an elbow, pointing into the flow
  4. Use two wells

Answer: Fit the well in an elbow, pointing into the flow. In an elbow the well can point along the pipe and get its full immersion. Enlarging the line locally also works.

Read the guideOpen the tool

#49In an instrument tag, what does the first letter tell you?
  1. The plant area
  2. The measured variable
  3. The function
  4. The loop number

Answer: The measured variable. The first letter is what is measured: P pressure, T temperature, F flow, L level.

Open the tool

#57Which standard is used to check thermowells for flow-induced vibration?
  1. API 520
  2. ASME B31.3 only
  3. ISA-5.1
  4. ASME PTC 19.3 TW

Answer: ASME PTC 19.3 TW. PTC 19.3 TW checks the wake frequency against the well’s natural frequency.

Read the guideOpen the tool

#64A circle inside a square on a P&ID bubble means what?
  1. A PLC
  2. A computer function
  3. A field instrument
  4. A DCS shared display or control

Answer: A DCS shared display or control. Circle in a square is the DCS. A plain circle is a discrete instrument, a hexagon a computer, a diamond in a square a PLC.

Open the tool

#71Why do flow meters need straight pipe before and after them?
  1. To make room for a bypass
  2. So the flow profile is settled and the reading is accurate
  3. For drainage
  4. So the meter can be removed

Answer: So the flow profile is settled and the reading is accurate. Elbows, valves and reducers disturb the flow. The meter datasheet gives the straight diameters needed.

Open the tool

#75A level bridle’s bottom connection must be below what?
  1. Grade
  2. The lowest level to be measured
  3. The vessel bottom
  4. The high level

Answer: The lowest level to be measured. If it sits above the low-low level, that level can never be seen and the low alarms cannot work.

Read the guideOpen the tool

#78Is ⅜ in tubing the same as 10 mm tubing?
  1. Only for air service
  2. No, ⅜ in is 9.5 mm and the fittings do not mix
  3. Only in stainless steel
  4. Yes

Answer: No, ⅜ in is 9.5 mm and the fittings do not mix. ⅜ in is 9.53 mm. Inch and metric compression fittings do not seal on each other.

Read the guideOpen the tool

#84On an instrument bubble, a solid line through the middle means…
  1. Mounted in the main control room, reachable by the operator
  2. Behind the panel
  3. Not installed yet
  4. Mounted in the field

Answer: Mounted in the main control room, reachable by the operator. No line is field mounted, a solid line is the main control room, a dashed line is behind the panel.

Open the tool

Layout

#10Where do cable trays usually go on a pipe rack?
  1. Between the pipes
  2. At grade beside the rack
  3. Top tier
  4. Bottom tier

Answer: Top tier. On the top tier, away from drips from flanges above and less exposed to fire at grade.

Read the guideOpen the tool

#24About how much does carbon steel pipe grow over 100 m for a 100 °C rise?
  1. About 12 mm
  2. About 120 mm
  3. About 1.2 mm
  4. About 1.2 m

Answer: About 120 mm. Carbon steel expands roughly 0.0117 mm per metre per °C, so 100 m × 100 °C gives about 117 mm.

Read the guideOpen the tool

#34Why are hot lines needing loops usually put at the outside edge of a rack?
  1. So the loops can be taken out without crossing other lines
  2. To be nearer the cable trays
  3. For better looks
  4. Because they are lighter

Answer: So the loops can be taken out without crossing other lines. From the edge, a loop can turn up and over or out sideways without clashing with the lines beside it.

Read the guideOpen the tool

#48On an isometric, how do you get a pipe cut length?
  1. Use the bend radius only
  2. Add the fittings to the dimension
  3. Measure the drawing with a ruler
  4. Take the dimension and subtract fitting take-outs and weld gaps

Answer: Take the dimension and subtract fitting take-outs and weld gaps. Isometrics are not to scale. Start from the dimension and subtract each fitting’s centre-to-end and the root gaps.

Read the guideOpen the tool

#59What does pipe spacing on a rack usually depend on?
  1. The pipe colour
  2. The larger flange OD plus clearance, or the insulation
  3. The cable trays
  4. Only the smaller pipe

Answer: The larger flange OD plus clearance, or the insulation. Lines are spaced so flanges, insulation and access clear each other with a set gap.

Open the tool

#67Expansion loops on a rack are usually turned where?
  1. Up over the top tier
  2. Down to grade
  3. Into the next unit
  4. Inside a column

Answer: Up over the top tier. Turning up over the rack keeps the loop clear of the other lines; plan where it crosses the cable trays.

Read the guideOpen the tool

#81How much spare space is commonly kept on a new pipe rack?
  1. About 20 to 25%
  2. None
  3. About 75%
  4. Double the width

Answer: About 20 to 25%. Most projects reserve roughly a fifth to a quarter of the width for future lines. Check the project specification.

Open the tool

Pipe

#2What is the outside diameter of NPS 6 pipe?
  1. 168.3 mm
  2. 160.0 mm
  3. 165.1 mm
  4. 152.4 mm

Answer: 168.3 mm. NPS 6 pipe is 168.3 mm (6.625 in) outside diameter for every schedule. Only the wall changes.

Read the guideOpen the tool

#12Going from Sch 40 to Sch 80 on the same NPS changes what?
  1. The flange class
  2. The outside diameter
  3. The wall thickness and the bore
  4. The pipe length

Answer: The wall thickness and the bore. The OD stays fixed. A heavier schedule adds wall on the inside, so the bore gets smaller.

Read the guideOpen the tool

#21For NPS 14 and larger, the NPS number equals what?
  1. The OD in centimetres
  2. The bore in inches
  3. The schedule
  4. The OD in inches

Answer: The OD in inches. From NPS 14 up, the nominal size is the actual outside diameter in inches. Below that it is only a name.

Open the tool

#31NPS 2 pipe is which DN?
  1. DN 65
  2. DN 60
  3. DN 50
  4. DN 40

Answer: DN 50. NPS 2 is DN 50. The DN number is roughly the NPS in millimetres, rounded.

Open the tool

#39Which of these is NOT a stainless steel pipe schedule?
  1. Sch 80S
  2. Sch 40S
  3. Sch 120S
  4. Sch 10S

Answer: Sch 120S. ASME B36.19 stainless schedules are 5S, 10S, 40S and 80S. There is no 120S.

Open the tool

#46Up to which size are STD wall and Sch 40 identical?
  1. NPS 2
  2. NPS 10
  3. NPS 24
  4. NPS 4

Answer: NPS 10. Through NPS 10, STD and Sch 40 have the same wall. From NPS 12, STD is thinner (9.53 mm).

Open the tool

#56What is the wall thickness of NPS 6 Sch 40?
  1. 8.18 mm
  2. 7.11 mm
  3. 10.97 mm
  4. 6.02 mm

Answer: 7.11 mm. NPS 6 Sch 40 is 7.11 mm. Sch 80 is 10.97 mm.

Read the guideOpen the tool

#68What is the empty weight per metre of NPS 6 Sch 40 steel pipe?
  1. About 15.1 kg/m
  2. About 42.6 kg/m
  3. About 28.3 kg/m
  4. About 18.6 kg/m

Answer: About 28.3 kg/m. W = 0.02466 × (OD − t) × t = 0.02466 × (168.3 − 7.11) × 7.11 ≈ 28.26 kg/m.

Read the guideOpen the tool

Supports

#4Which support stops pipe movement in every direction?
  1. Guide
  2. Anchor
  3. Rest
  4. Spring hanger

Answer: Anchor. An anchor fixes the pipe in all directions. Guides allow axial movement, rests only carry weight.

Read the guideOpen the tool

#14Why can a rigid rest lose contact when a line gets hot?
  1. The bolts loosen
  2. Thermal growth lifts the pipe off it
  3. The rest softens
  4. Pressure bends the steel

Answer: Thermal growth lifts the pipe off it. When nearby equipment and the line grow with heat, the pipe can rise off a rigid rest and its load moves elsewhere. A spring hanger follows the movement.

Read the guideOpen the tool

#23What does a guide allow the pipe to do?
  1. Move along its axis but not sideways
  2. Move sideways only
  3. Rotate only
  4. Not move at all

Answer: Move along its axis but not sideways. A guide holds the pipe in line sideways while letting it slide axially as it grows.

Read the guideOpen the tool

#32Which support suits a line that moves up and down when it heats up?
  1. Anchor
  2. Rigid rest
  3. Guide
  4. Variable spring hanger

Answer: Variable spring hanger. A variable spring keeps carrying the load while the pipe moves vertically.

Open the tool

#41What is a pipe shoe for?
  1. Measuring flow
  2. Draining the line
  3. Lifting the pipe off the steel so insulation can pass
  4. Isolating cathodic protection

Answer: Lifting the pipe off the steel so insulation can pass. The shoe raises the pipe so the insulation is not crushed, and it slides on the support steel.

Read the guideOpen the tool

#51What is a trunnion support?
  1. A short pipe welded to an elbow that rests on a support
  2. A type of valve
  3. A spring hanger
  4. A flange type

Answer: A short pipe welded to an elbow that rests on a support. A trunnion is a stub of pipe welded to an elbow or pipe that carries the line down to a support or base plate.

Read the guideOpen the tool

#62Which pipe needs supports closer together?
  1. All the same
  2. NPS 2 full of water
  3. NPS 12 empty
  4. NPS 12 full of water

Answer: NPS 2 full of water. Small pipe is much less stiff, so its allowable span is far shorter even though it carries less.

Open the tool

#88What are shear lugs welded to the pipe for?
  1. To drain the line
  2. To earth the pipe
  3. To carry axial load into an anchor or guide
  4. To hold insulation

Answer: To carry axial load into an anchor or guide. Lugs welded to the pipe bear against the support steel, so axial forces pass into the structure.

Read the guideOpen the tool

Testing

#5What is the minimum hydrotest pressure under ASME B31.3?
  1. 1.5 × design pressure, corrected for temperature
  2. 2 × design pressure
  3. 1.1 × design pressure
  4. Equal to design pressure

Answer: 1.5 × design pressure, corrected for temperature. B31.3 asks for at least 1.5 times the design pressure, raised by the ratio of allowable stress at test and design temperature.

Read the guideOpen the tool

#15Is hydrotest pressure the same at the top and bottom of a tall riser?
  1. No, it is higher at the top
  2. No, it is higher at the bottom by the water head
  3. Only if the line is horizontal
  4. Yes, pressure is equal everywhere

Answer: No, it is higher at the bottom by the water head. Water adds about 0.98 bar for every 10 m of height, so the low point sees more than the gauge at the top.

Read the guideOpen the tool

#27What is the minimum pneumatic test pressure under ASME B31.3?
  1. 1.25 × design pressure
  2. 2 × design pressure
  3. 1.5 × design pressure
  4. 1.1 × design pressure

Answer: 1.1 × design pressure. A pneumatic test uses at least 110% of design pressure. Air stores much more energy than water, so it needs extra precautions.

Read the guideOpen the tool

#44Before hydrotest, what should you do with spring hangers?
  1. Lock them so they do not move under the water weight
  2. Leave them free
  3. Remove them
  4. Set them to the hot load

Answer: Lock them so they do not move under the water weight. A water-filled line is far heavier than in service, so springs are pinned during the test and released afterwards.

Read the guideOpen the tool

#55How much does water head add for every 10 m of height?
  1. About 1 bar
  2. About 10 bar
  3. About 5 bar
  4. About 0.1 bar

Answer: About 1 bar. 10 m of water is about 0.98 bar, so tall risers need the bottom checked as well as the top.

Read the guideOpen the tool

#72Why are high points vented before a hydrotest?
  1. To drain it faster afterwards
  2. To cool the water
  3. To lower the test pressure
  4. So air escapes and the line fills completely

Answer: So air escapes and the line fills completely. Trapped air compresses, stores energy and spoils the test, so vents at high points let it out while filling.

Read the guideOpen the tool

Valves

#1Which valve should you never use to throttle flow?
  1. Gate valve
  2. Globe valve
  3. Needle valve
  4. Butterfly valve

Answer: Gate valve. A gate valve is made to be fully open or fully shut. Part-open, flow squeezes under the wedge and wears the seats until it leaks. Throttle with a globe valve.

Read the guideOpen the tool

#11Which valve is best for throttling a small line by hand?
  1. Plug valve
  2. Gate valve
  3. Standard ball valve
  4. Globe valve

Answer: Globe valve. A globe valve controls flow smoothly over its whole stroke, which is why it is also used on control valve bypasses.

Read the guideOpen the tool

#20What does a check valve do?
  1. Relieves overpressure
  2. Isolates for maintenance
  3. Stops reverse flow
  4. Throttles flow

Answer: Stops reverse flow. A check valve opens with forward flow and closes when flow tries to reverse, for example on a pump discharge.

Read the guideOpen the tool

#28Which valve opens or closes with a quarter turn?
  1. Globe valve
  2. Ball valve
  3. Needle valve
  4. Gate valve

Answer: Ball valve. A ball valve turns 90° from open to shut. Gate and globe valves need many turns of the handwheel.

Read the guideOpen the tool

#38In a control valve station, what is the bypass valve usually?
  1. Ball valve
  2. Check valve
  3. Globe valve
  4. Gate valve

Answer: Globe valve. A globe valve, because the operator throttles flow by hand on the bypass while the control valve is out.

Read the guideOpen the tool

#45On a P&ID, what does a valve drawn with a filled (solid) body usually mean?
  1. Normally closed
  2. Globe valve
  3. Check valve
  4. Control valve

Answer: Normally closed. Most legends show a normally closed valve with a filled body. Always check the project legend sheet.

Read the guideOpen the tool

#54Why are drains fitted between the block valves and a control valve?
  1. To empty and depressure the trapped section before removing it
  2. Only for hydrotest
  3. To measure flow
  4. To vent gas in normal operation

Answer: To empty and depressure the trapped section before removing it. With both block valves shut, the drains let maintenance empty and depressure the section before opening it up.

Read the guideOpen the tool

#61What is a PSV?
  1. Pump suction valve
  2. Process sample valve
  3. Pressure switch valve
  4. Pressure safety valve

Answer: Pressure safety valve. The pressure safety valve opens to protect equipment from overpressure.

Open the tool

#69Where possible, which way should a control valve actuator point on a horizontal line?
  1. Sideways
  2. Up
  3. Down
  4. Any way

Answer: Up. Stem vertical with the actuator up keeps the packing and actuator in their best position and makes removal easier.

Read the guideOpen the tool

Answers follow the ASME standards and common project practice. Your project specification always governs.